pub:projects:start
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
pub:projects:start [2013/01/05 13:13] – structure redesign gjn | pub:projects:start [2013/10/31 15:36] – wta | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | ~~NOTOC~~ | ||
+ | {{page> pub: | ||
====== GEIST Research Projects ====== | ====== GEIST Research Projects ====== | ||
Line 5: | Line 7: | ||
===== Current projects ===== | ===== Current projects ===== | ||
- | * **[[Prosecco]]** | + | |
- | * **[[SaMURaI]]** | + | ==== Prosecco ==== |
- | * **[[HiBuProBuRul]]** | + | |
- | * **[[INDECT]]** | + | {{: |
+ | [[.prosecco: | ||
+ | which is a 32 months long NCBR PBS project started in 2012-12. | ||
+ | The goal of the project is to address the needs and constraints of small and medium enterprises (SME) by designing methods that will significantly improve their Business Process Management systems. | ||
+ | |||
+ | See [[http:// | ||
+ | |||
+ | ==== SaMURaI ==== | ||
+ | |||
+ | {{pub: | ||
+ | [[.samurai: | ||
+ | which is a 24 months long NCN project started in 2012-09. | ||
+ | The main objective of the project is | ||
+ | the development of a | ||
+ | //Semantic Method for Unified Rules Interoperability in Knowledge-Based Systems// | ||
+ | |||
+ | ==== HiBuProBuRul ==== | ||
+ | |||
+ | {{: | ||
+ | [[.hibuproburul: | ||
+ | which is a 24 months long NCN project started in 2012-09. | ||
+ | The main objective of the project is | ||
+ | the development of a | ||
+ | // | ||
+ | |||
+ | ==== INDECT ==== | ||
+ | |||
+ | {{: | ||
+ | [[.indect: | ||
+ | which is a large EU collaboration project coordinated by [[http:// | ||
+ | The aim of the project is the development of an | ||
+ | intelligent information system supporting observation, | ||
+ | |||
+ | See [[http:// | ||
===== Completed projects ===== | ===== Completed projects ===== | ||
==== Parnas ==== | ==== Parnas ==== | ||
- | {{ : | + | {{: |
- | **[[Parnas|Read more on Parnas]]**, which was a 18 month long NCN project on // tools for inference control and quality analysis in modularized rulebases// | + | **[[.: |
See [[http:// | See [[http:// | ||
Line 20: | Line 55: | ||
==== BIMLOQ ==== | ==== BIMLOQ ==== | ||
- | {{ : | + | {{: |
- | **[[BIMLOQ|Read more on BIMLOQ]]**, which was 32 month long NCN project on //business models and processes optimization for quality//. | + | **[[.bimloq: |
See [[http:// | See [[http:// | ||
Line 27: | Line 62: | ||
==== HeKatE ==== | ==== HeKatE ==== | ||
- | {{ : | + | {{: |
- | **[[HeKatE|Read more on HeKatE]]**, which was a 30 month long NCN project on //hybrid knowledge engineering methodology for knowledge-based systems//. | + | **[[.hekate: |
See [[http:// | See [[http:// | ||
- | ===== Past projects ===== | + | ===== Related |
The members of the group were involved in several projects. | The members of the group were involved in several projects. | ||
Selected projects include: | Selected projects include: | ||
Line 62: | Line 97: | ||
[[http:// | [[http:// | ||
+ | {{like> |
pub/projects/start.txt · Last modified: 2022/07/14 19:15 by kkt