GEIST Research Group

We are GEIST. We dream big and work hard.

User Tools

Site Tools


pub:projects:bimloq

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Last revisionBoth sides next revision
pub:projects:bimloq [2011/02/01 12:11] – logo uploaded wtapub:projects:bimloq [2013/01/10 12:57] – external edit 127.0.0.1
Line 1: Line 1:
 +~~NOTOC~~
 ====== Bimloq ====== ====== Bimloq ======
-{{ :pub:projects:bimloq-logo2.png?w150|}} 
-The main aim of Business Models Optimization for Quality (BIMLOQ) is to build a declarative model for business processes, including business rules specification, with an emphasis on analysis and optimization of those processes.   
  
-===== Description =====+//**B**us**i**ness **M**ode**l**s **O**ptimization for **Q**uality// (**BIMLOQ**)
  
-====Motivation====+<WRAP center round info 60%> 
 +  * MNiSW Research Grant no. N516 422338 {{  :pub:projects:bimloq-logo-transparent.png?w215|}} 
 +  * **Project Leader:** [[pub:about_us:ali|prof. dr hab. inż. Antoni Ligęza]]  
 +  * **Project Coordinator:** [[pub:about_us:gjn|dr hab. inż. Grzegorz J. Nalepa]]  
 +  * **Timeline:**  2010-05->2012-12 
 +  * **Duration:**  32 months 
 +</WRAP> 
 + 
 +===== Motivation ====
 + 
 +The main aim of Business Models Optimization for Quality (BIMLOQ) is to build a declarative model for business processes, including business rules specification, with an emphasis on analysis and optimization of those processes.  
  
   * **Semantic:** lack of a common ontology, lack of unified semantics, difficult unambiguous logical representation.   * **Semantic:** lack of a common ontology, lack of unified semantics, difficult unambiguous logical representation.
Line 12: Line 20:
   * **Technical:** technologies used in the visual design layer are incompatible with the declarative logical representation.   * **Technical:** technologies used in the visual design layer are incompatible with the declarative logical representation.
  
 +===== Intended results =====
 +  * **Conceptual:** declarative model for logical business process representation and analysis.
 +  * **Practical:**
 +    * new tools for analysis and optimisation of specification quality,
 +    * integration of visual BPMN tools and logical knowledge processing.
 +  * **Evaluative:** modeling and analysis of real-life application use cases.
  
-====Problem statement====+** Expected benefits: ** 
  
- 
-====Expected benefits==== 
   * Real-time quality assessment during development.   * Real-time quality assessment during development.
   * Maintainability assurance.   * Maintainability assurance.
Line 22: Line 34:
   * High adaptability in dynamic environments.   * High adaptability in dynamic environments.
  
 +===== News =====
  
-====Intended results==== +  * **14.04.2011** //The BIMLOQ Project Overview// presentation during the Explicite Seminar ([[http://cslab.ia.agh.edu.pl/explicite:explicite20110414:start|more on the Explicite website]]) {{presentation.pdf}}
-  * **Conceptual:** declarative model for logical business process representation and analysis. +
-  * **Practical:** +
-    * new tools for analysis and optimisation of specification quality, +
-    * integration of visual BPMN tools and logical knowledge processing. +
-  * **Evaluative:** modeling and analysis of real-life application use cases. +
- +
-===== News ===== +
-===== Comments =====+
  
-{{tag>project  current_project}}+{{tag>project completed_project}}
  
 Go back to -> [[start|projects]]  Go back to -> [[start|projects]] 

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki